EWP HIRE MELBOURNE

The Right Machine. Maintained. Backup. Ready This Week.

EWP hire across Melbourne, with the paperwork that gets it through the gate. Insulated platforms from 12.8 m to 23.5 m, each with a current electrical test certificate, a logbook and a service history you can hand to a site.

Pick a machineBrowse our wide range of insulated EWPs and cherry pickers we hire out. Click one to see what it does.GMJ LL22.350 23.5 mRedmond Gary TF17M 19 mSherrin 18 m 18 mTerex Hi-Ranger LT40 13.8 mVersalift SST-37 12.8 mGMJ TT16Altec AT30-C

Dylan from Valley Wide Tree Services in a 1800 GO TREES hi-vis work shirt
Tower Types
0 +
Maximum Working Height
0 m
Electrical Test Cycle
0 mth
Team Members
0 +

We bring the machine to you.

Wherever the job is — Melbourne, or anywhere else in Victoria — the tower is delivered to your site, and it stays looked after there. Troubleshooting, servicing, recertification and, if it ever comes to that, a replacement machine all come to you as well. You tell us the address and the start date.

What you are hiring

EWP hire Melbourne: what a site asks to see

EWP hire Melbourne wide, with the paperwork that gets it through the gate. Insulated platforms from 12.8 m to 23.5 m, each with a current electrical test certificate and the machine logbook.

On a council job, a substation, a rail corridor or a managed commercial property the machine is checked before it is used: test certificate in date, logbook present, service history available, operator ticketed. A machine that arrives without that sits at the gate.

Electrical test every six months, covers-off inspection every three, annual load test, and the ten-year major inspection tracked from the build date. If a certificate would fall due inside your hire, the machine is done before it goes out.

EWP hire Melbourne: what a site asks to see
Current electrical test certificateIn the cab. Six-monthly on every machine in this fleet.
LogbookTravels with the machine, complete and current.
Annual load test recordHeld with the machine’s service history.
Ten-year major inspection statusTracked from build date under AS 2550.10.
Operator high risk work licenceYours on dry hire. Ours on wet hire, along with the insurance.
What comes with it

The machine turns up with its file, not a promise to send it later

On a commercial site the machine is only half of what you are hiring. The principal contractor wants the plate, the test certificate and the load test before anyone leaves the ground, and chasing those after delivery is how a first day gets lost.

Certificates in the cab

The paperwork arrives with the truck

Compliance plate on the machine, electrical test certificate and load test certificate in the cab, in date. You are not waiting on an email from a hire desk while a crew stands around, and you have what you need if anyone asks to see it.

Tested on a schedule

Every six months, every machine

Every truck gets a full covers-off safety inspection every three months, an electrical test every six months that confirms it is safe to be working with and around live power lines, and a load test every twelve months covering the boom, the basket and the legs.

Compliance never stops the job

A machine coming off for testing does not cost you a day

When a machine is due for its testing or recertification it comes away from you and another one goes out. That is standard, not a favour, and it means your compliance dates are our scheduling problem rather than your downtime.

How the hire runs

Tell us the site. We send the machine and its file.

We go through the whole contract with you when you sign up, check it suits the work you are actually doing and look at any scenarios specific to your side before you start. It is straightforward, and it means there is nothing to argue about later.

01.

Tell us what the site requires

What the principal contractor wants to see, what you are working near and how long you need the machine. If there is a site-specific requirement, tell us before we quote rather than after.

02.

We match the machine and the certificates

We confirm the machine, check its test dates against your hire period, and make sure nothing falls due mid-job without a replacement already lined up.

03.

It arrives ready to be inducted

Plate legible, certificates in date and in the cab, machine clean enough that anyone inspecting it can see what they are looking at.

What you should be handed with an EWP, every time

There are four documents that decide whether a machine can be put to work on a commercial site, and all four should exist before the truck leaves our yard. The compliance plate is fixed to the machine and carries its rating. The electrical test certificate confirms the insulation is intact. The load test certificate covers the boom, the basket and the legs. And the logbook shows the maintenance has actually happened rather than being asserted.

We keep those current because our own schedule requires it, not because a client asked. Every machine gets a full safety inspection every three months with every cover off, and pins, bushes, hoses, legs, tyres and wheel bearings all checked. The trucks are kept clean and painted for a reason that is not cosmetic – a hairline crack on a clean machine is visible the day it appears, and cutters tend to favour the passenger side when they work, so that is where the stress goes and where cracks tend to start.

The one thing the paperwork does not do is give you permission. An insulated machine is what makes work near an electrical asset possible, but the approval to do that work comes from the asset owner and the requirements come from Energy Safe Victoria. Hire the right machine and get the approval separately – one is not a substitute for the other.

If your site needs something we have not mentioned, ask before you book. It is a short conversation now and a lost morning later.

Questions

Frequently asked questions

What paperwork comes with the machine?

The compliance plate is on the machine. The electrical test certificate, the load test certificate and the logbook are in the cab, in date, when it arrives.

How often is the insulation tested?

Every six months on every machine. That test confirms the truck is still safe to be working with and around live power lines.

What does the annual load test cover?

The boom, the basket and the legs.

What happens when a machine is due for testing mid-hire?

It comes away and a replacement goes out. You keep working while the testing is done.

Does the machine’s rating mean I can work in a No Go Zone?

No. The rating is what makes the work possible. The approval comes from the asset owner and the requirements come from Energy Safe Victoria.

More on this service

See more about our insulated EWP hire service in Melbourne

GET Your Free Quote

Need help? Have a question? Just enter your details. We’ll contact you as soon as we get your message.

🔒SSL Protected. We hate SPAM, and will never share your details.

Five star Google review of Valley Wide Tree Services from Daniel Fowler
CALL 1800 GOTREES